From roof assessment to energisation, here is the full picture of what a solar installation involves, what questions to ask and what to watch out for.
Gold Coast gets excellent solar irradiance year-round. A properly designed and installed system will run for decades. The difference between a system that performs and one that disappoints comes down to design quality, product selection and installation workmanship. Here is what each stage involves.
We design and install solar systems through our solar and battery service, sized to your actual usage rather than a standard package, including homes in Burleigh Heads and new estates in Pimpama.
Roof and site assessment
Before panels are ordered, the installer should assess the roof for structural condition, pitch, orientation and shading. North-facing at a pitch between 10 and 30 degrees delivers the most energy on the Gold Coast. East and west arrays work well for households that want morning or afternoon generation to match their usage. Shading from trees, chimneys or neighbouring buildings at different times of day must be mapped, not assumed away.
System design and sizing
Sizing from your actual electricity bills is more accurate than using a rule-of-thumb kilowatt-per-person figure. We pull your interval data from your retailer, which shows exactly when you use power, and design around that profile. This determines panel count, array orientation and whether a battery is worth adding now or later.
- Panel count and configuration
- Inverter type and capacity
- String design or microinverter/optimiser layout
- Battery-ready design if storage is planned
Grid connection and approval
Every grid-connected solar system requires approval from your electricity distributor (Energex on the Gold Coast). We lodge the application, handle the technical paperwork and coordinate metering changes. The process takes a few weeks. Power is not exported to the grid until approval is granted and a new meter is installed.
What to check before signing a quote
Not all quotes are comparable. Check the panel brand and tier rating, inverter brand and warranty, whether the quote includes the distributor application fee, and what the workmanship warranty covers. Price is important, but a cheap system with undersized wiring or a no-name inverter costs more over ten years than a quality installation.
Tip: Ask for the panel datasheet and inverter datasheet. A reputable installer will provide them without hesitation.
Key takeaways
- Size from interval data, not a per-person rule of thumb.
- Grid connection approval from Energex is required before export.
- Compare panel tier, inverter warranty and workmanship coverage, not price alone.
Frequently asked questions
- How long does installation take?
- Most residential systems are installed in one to two days. Grid approval and metering can take a few weeks after installation before you can export.
- Do I need council approval for solar panels?
- In most cases no, as solar is exempt development in Queensland. Heritage-listed properties or those in a heritage overlay may need approval. We check this as part of the assessment.
- How quickly can FitElec attend?
- We are open 24 hours for urgent electrical work and book standard jobs within days. Call Jayson on 0425 663 172 for a current schedule.
- Where does FitElec work?
- FitElec is based at Palm Beach and services the whole Gold Coast, from Coolangatta to Coomera and everywhere in between.
Related services
Questions? Call FitElec on 0425 663 172 — Gold Coast's licensed electricians.